news
After four years in Badalona, where the growth of our sales and the power delivered has been increasing exponentially, we needed to enlarge our workspace to sustain our expansion. Finally, and after many months of work, we are proud to show you our new facilities, located in Argentona.
Our new workspace has more than 800 m2 for its production, research and offices. We have taken advantage of this change to improve the facilities to work more effectively and increase the power capacity of our tests. Argentona’s facilities have more space and renewed equipment in the production areas, R&D laboratories and offices.
From now on you can find us at the following address:
C/ Can Baletes 7, Nau A (Polígon el Cros) • 08310 Argentona (BARCELONA)
news
CINERGIA at RT24 UK: Driving Innovation in PHiL and Real-Time Simulation
We are proud to sponsor RT24 UK, OPAL-RT’s highly anticipated Regional Conference on Power Systems and Power Electronics Real-Time Simulation, taking place in Edinburgh on November 28–29, 2024.
news
GE&EL ePLUS AC/DC: the most flexible and unique testing equipment
A product that gets-together the whole CINERGIA’s catalogue combining the functionalities of a Grid Simulator, an Electronic Load and a DC Bidirectional Converter
news
Discover the Rack Series, CINERGIA's latest release
Rack Series family, the most efficient regenerative converters in 19-inch rack format for testing platforms and EOL
news
New Cinergia Product Catalogue
Your Guide to Reliable and Efficient Power Electronics
Votre expérience sur ce site sera améliorée grâce à l'utilisation de cookies.