news
After four years in Badalona, where the growth of our sales and the power delivered has been increasing exponentially, we needed to enlarge our workspace to sustain our expansion. Finally, and after many months of work, we are proud to show you our new facilities, located in Argentona.
Our new workspace has more than 800 m2 for its production, research and offices. We have taken advantage of this change to improve the facilities to work more effectively and increase the power capacity of our tests. Argentona’s facilities have more space and renewed equipment in the production areas, R&D laboratories and offices.
From now on you can find us at the following address:
C/ Can Baletes 7, Nau A (Polígon el Cros) • 08310 Argentona (BARCELONA)
news
Do you need to emulate electrical loads?
Our EL+ vAC AC is a current source designed to emulate the electrical behavior of passive and active devices connected to the grid
news
40 and 50kVA isolation transformers are no longer external cabinets
Discover our two new isolation transformer models
news
The future of Smart Grids
We review the current market situation and then gather different opinions to understand the next steps that the sector should take
news
Discover our Regenerative and Bidirectional DC Converter: the B2C+
The B2C+, our Regenerative DC Converter for e-mobility solutions
Votre expérience sur ce site sera améliorée grâce à l'utilisation de cookies.