news
After four years in Badalona, where the growth of our sales and the power delivered has been increasing exponentially, we needed to enlarge our workspace to sustain our expansion. Finally, and after many months of work, we are proud to show you our new facilities, located in Argentona.
Our new workspace has more than 800 m2 for its production, research and offices. We have taken advantage of this change to improve the facilities to work more effectively and increase the power capacity of our tests. Argentona’s facilities have more space and renewed equipment in the production areas, R&D laboratories and offices.
From now on you can find us at the following address:
C/ Can Baletes 7, Nau A (Polígon el Cros) • 08310 Argentona (BARCELONA)
news
CINERGIA at RT24 UK: Driving Innovation in PHiL and Real-Time Simulation
We are proud to sponsor RT24 UK, OPAL-RT’s highly anticipated Regional Conference on Power Systems and Power Electronics Real-Time Simulation, taking place in Edinburgh on November 28–29, 2024.
news
We will be at the Electronica virtual trade fair next week
This year, due to the pandemic situation, the fair has reinvented itself and has opted for the digital format
news
Discover our Regenerative and Bidirectional DC Converter: the B2C+
The B2C+, our Regenerative DC Converter for e-mobility solutions
news
Why HiL and PHiL are shaping the future of advanced power testing
As power systems become more complex, test environments must become more flexible, realistic and efficient.
Your experience on this site will be enhanced with the use of cookies.