Our interface software is an indispensable tool for power electronic engineers to access all the functionalities of its converters. It also allows us to precisely control on charge, discharge and cycling of any kind of battery.
On the one hand, the basic parameters of this software include fast charge, float voltages and the charge and discharge of currents. On the other hand, advanced parameters add Energy (Ah) and time as transition conditions.
Although one of the main challenges in the battery market is conditioned by its life cycle, the investment in constant innovation from R&D teams enables the development of the most recent technologies to extend their useful life. In order to evaluate the performance of batteries, it is necessary to execute charge and discharge tests to find the best shape.
CINERGIA has developed a specialized module in battery testing to create flexible and intuitive sequence of battery cycles. Our interface software is an essential tool for power electronic engineers to access to all functionalities of its converters. It also allows us to precisely control on charge, discharge and cycling of any kind of battery. On the one hand, basic parameters of this software include fast charge, float voltages and the charge and discharge of currents. On the other hand, advanced parameters add Energy (Ah) and time as transition conditions.
CINERGIA offer a solution that is characterized by a clear and intuitive design. Its easy handling saves us time in the test setup.
Control buttons
Save as CSV - Save all parameters of the configuration in a CSV file, to use anytime.
Load as CSV - Load parameters of configuration from the CSV file.
Advanced Settings - Change the windows to basic or advanced parameters.
Send Set Points - Send all parameters to the converter to start the test.
Boost Voltage (VBoost) - Maximum voltage of the battery. The equipment will charge the battery until it reaches this voltage.
Charging Current (I Charging) - Maximum accepted input current of the battery. The higher the current is, the faster will be charged the EUT, but be sure that this parameter is lower than the maximum current accepted of the battery.
Floating Voltage (VFloating) - Once the battery has reached the boosting voltage (the maximum voltage), the converter will make the EUT to remain in the floating voltage which is lower than the boost voltage.
Charging to Floating Current (I Charge to Floating) - To make the battery remain in the floating voltage some current must flow inside it, otherwise it would lose voltage. Once this current reaches the introduced value, the equipment will start discharging the battery.
Discharging Voltage (VDischarging) - It is the minimum voltage where the converter will make the battery reach. A lower voltage than the one accepted for the EUT would make it irreversible damages in the battery.
Discharging Current (I Discharging) - The Cinergia equipment will discharge the battery until the discharging voltage with this current. It is the only parameter that must be negative.
Boost Time - Maximum time (in seconds) that the equipment will be boosting. The maximum time is almost 4 months and the minimum are 0s.
Floating Time - Maximum time (in seconds) that the equipment will be floating. The maximum time is almost 4 months and the minimum are 0s.
Time Transition - Maximum time (in seconds) that the equipment will be waiting for the transition (from charged to discharge). The maximum time is more than 1 day, and the minimum is 0s.
Time Discharge - Maximum time (in seconds) that the equipment will be discharging. The maximum time is more than 1 day, and the minimum is 0s.
Ah Stop Charge - Maximum value of Ah that the converter will allow to charge the battery. The maximum is 1000000000Ah and the minimum is 0Ah.
Ah Stop Discharge - Maximum value of Ah that the converter will allow to discharge the battery. The maximum is 0Ah and the minimum is -1000000000Ah.
There is a figure that illustrates all that parts above mentioned:
This window contains indicators of the voltage and current for each channel. It also has another parameter to be introduced in the converter: the amps per hour of the battery. This value must be negative and is the value that indicates the capacity of the battery.
For example, if the battery has a capacity of 100Ah, it means that can deliver 10A during 10h or 1A during 100h and so on. To introduce this parameter, write it to the corresponding blue window depending on the channel to be introduced and press intro in the keyboard.
Status of the converter - It is an indicator that shows the status in the actual moment.
Status selector - The user must select the status by moving the slider right or left (right goes to discharge and left to charge. The slider in the middle means Stop)
Cycling selector - In this part of the window, the user can enable the cycling mode of the equipment. If the cycling mode is selected, the corresponding LED is illuminated.
It is also possible to determinate the number of cycles that the equipment will make to the EUT. Once all the cycles are completed, the equipment will stop automatically.
All these operations can be done for each channel as the figure shows. The first row is for the U channel, the second for the V, the third for the W and the last for the parallel mode (global).
For further information or inquiries, please do not hesitate to contact us.
You can download the whole case here
Downloadnews
Reflections on RT24 UK: CINERGIA Showcases PHiL Solutions
Recently, CINERGIA had the pleasure of attending RT24 UK, OPAL-RT's Regional Conference on Power Systems and Power Electronics Real-Time Simulation, held in Edinburgh.
news
GE&EL+ vAC/DC: the most versatile converter in the energy testing market
It gets together the whole CINERGIA’s catalogue in a single unit
news
CINERGIA showcases the latest in Regenerative Power Solutions at Electronica 2024
Join us at Hall A3, Booth 258 to discover how our solutions are powering progress in electromobility, smart grids, and renewable energy applications.
news
Countdown to Innovation: The Rack Series is coming soon
CINERGIA's Rack Series launch is on the horizon: a new line of 19" rack format regenerative converters that will set new standards in the testing field.
Your experience on this site will be enhanced with the use of cookies.